Quality management for construction machinery in civil engineering

Processing time is more than 90 percent shorter. The application automatically analyses soil-compaction machine data and provides a daily view of construction progress and quality deviations. The project team can review and act on the results directly.

Key facts
More than 90 percent shorter analysis process
Daily view of construction progress and quality deviations
Automatic comparison of planned and actual data
Analysis knowledge retained in the system
Client
SGL Spezialleistungen
Industry
Construction

Quality assurance in former open-cast mines: measurements inform site decisions

Soil compaction during the restoration of former open-cast mines requires traceable quality checks. SGL Spezialleistungen needs more than measurements stored on machines: execution, performance and deviations must be visible the same day for timely quality assurance and reporting.

The application combines machine data with planning values, compares targets with actual results and makes them available both on site and in the office.

Automatic machine-data analysisPlanned versus actual comparisonEarly deviation detectionOffline use on siteCentral reporting
Analysis software dashboard: weekly penetration-depth overview, progress and performance metrics, and a map showing deviations from target speed

The starting point: machine measurements analysed by hand

The construction machines already recorded measurements on their computers. The bottleneck was the subsequent checking and preparation: repetitive steps took time and required knowledge held by only a few people. A current assessment of the site depended on when this analysis was completed.

Raw data and planning values had to be combined for review.
Quality deviations became visible only after manual processing.
Daily analysis required project-specific expertise.

The turning point: a daily review process built on raw data

01

Examined the process with specialists

Interviews showed that the data already existed on the machines. The team lost time in recurring checks, so we modelled the analysis as a continuous digital process.

02

Imported machine data automatically

Daily offline data feed directly into the business checks.

03

Compared planning and execution

The planned-versus-actual comparison makes deviations visible and relates them to the quality and performance metrics used by the team.

04

Provided results at both workplaces

The application works offline on site. When connected, it synchronises with the company server so office analysis and reports use the same data.

According to the documented project results, more than 90 percent of the former processing time has been eliminated. The team reviews construction progress and quality daily.

> 90 %
shorter processing time
Daily overview of the construction site
Reviewing prepared data
The team uses prepared data and focuses on deviations.
Same-day response
Quality and performance figures are available without waiting several days.
Knowledge retained in the system
The analysis process no longer depends on individual specialists.
Shared data for site and office
Local work and central reports use the same data foundation.
SGL Spezialleistungen

SGL Spezialleistungen is a General Atomics Group subsidiary specialising in civil engineering. Its work includes environmental construction, soil compaction and ground stabilisation.

The company mainly operates in southern Brandenburg and on the restoration of former open-cast mines in Lusatia.

Visit SGL Spezialleistungen’s website

Construction site in a former open-cast mine: a dragline excavator and wheel loader stand on compacted sandy ground under a blue sky

We develop specialist applications that turn existing data into a dependable review process, giving the team a shared basis for daily decisions.